
City opens applications for below-market downtown condos
City Community Development Department opens application window for deed-restricted downtown condominium residences
2 min read
Walnut Creek housing, development and commercial property
Projects in the City of Walnut Creek’s planning records, by the status each project’s record states.
These records were last read from the City of Walnut Creek’s website on Oct. 2, 2026. They may have changed since.
9 of 30 projects
Under construction · Residential
2670-2680 Walnut Blvd.
A project to subdivide two existing lots into a 13-lot subdivision with 13 single-family small-lot homes. The applicant is seeking streamlined ministerial review under SB 330 and a Density Bonus.
Under construction · Residential
699 Ygnacio Valley Rd.
The applicant, RCD, is proposing to demolish all structures associated with the former gas station and construct a new 5-story, mixed-use residential building containing 93, 100% affordable residential units and approximately 2,622 square feet of ground floor commercial area. 41 onsite parking spaces are provided in an enclosed garage located behind the commercial space with access off Civic Drive. The residential units are organized around a shared, 8,500 square foot courtyard space above the garage level. The applicant also requests State Density Bonus concessions and waivers of development standards for…
Under construction · Commercial
1823 & 1871 N. Main St.
Demolition of the vacant Target Garden Center and construction of a new 5,700 square foot freestanding bank with drive up ATM and customer parking lot.
Under construction · Residential
1250 Las Juntas Wy.
Development of a 42-unit multi-family residential project on a vacant site, formerly the Las Juntas Swim Club site. 67 total parking spaces on a surface lot. Site size: 2.05 acres.
Under construction · Commercial
2717 N. Main St., 1530 2nd Ave., & 1510 2nd Ave.
The proposed project is a PD Rezone, Design Review and Lot Merger. The proejct will demolish all existing structures (former Masses building) and merge three parcels (2717 N. Main Street, 1530 2nd Avenue, and 1510 2nd Avenue) into a single 2.38-acre site to construct a new Porsche dealership. The three-level building includes a Basement level with vehicle inventory and wash bays, Ground floor with the auto service area, sales showroom, and offices, and Second floor with additional office space and inventory parking. The showroom will front both N. Main Street and 2nd Avenue, while the service/repair operations…
Under construction · Commercial
1021 Stanley Dollar Drive
The project is proposing to build a new 12,309 sq. ft. Pickleball Court Facility. The project includes new landscaping, site design, lighting, and Tree removals. On December 4, 2024, the Design Review Commission held a Study Session to provide feedback on the proposed development. On March 27, 2025, the Planning Commission approved the project.
Under construction · Commercial
2700 Mitchell Dr.
The proposed project is a multi-use development which would include a 155,628-square-foot, three-story self-storage facility; a 1,040-square-foot, single-story leasing office building with public restroom facilities; and an 8,975-square-foot, two-story redeveloped Calicraft building. The self-storage facility would have three stories, each approximately 51,876 square feet for a total area of 155,628 square feet. The Calicraft building would be two-story and would have indoor, patio, and bar seating, as well as associated 50-seat outdoor gathering area and a 320-square-foot shipping container to be used as a bar…
Under construction · Residential
730 & 748 Minert Rd.
Demo two existing homes to subdivide 2.03 acres into 17 single family lots (SB330, density bonus project).
Under construction · Mixed Use
200 Ygnacio Valley Rd.
596 residential apt units, 30,000 sq. ft. commercial space and a 5 level parking garage for 1,500 vehicles. Phases 1 and 2 are complete. The Waymark (Phase 3) is pending.
Source: City of Walnut Creek Development Projects · Checked Oct. 2, 2026 · The City says its Project Pipeline list was last updated May 8, 2026
Homes in the housing projects the City of Walnut Creek tracks, by income level.
These records were last read from the City of Walnut Creek’s website on Oct. 2, 2026. They may have changed since.
| Project | Very low | Low | Moderate | Above moderate | Total |
|---|---|---|---|---|---|
| Hope VillageEntitlement Approved · 2102 Tice Valley Blvd. | 6 | 0 | 0 | 0 | 6 |
| Mitchell TownhomesPlanning Application Submitted · 2775 Mitchell Drive | 0 | 85 | 0 | 337 | 422 |
| Mt. Diablo Mixed UseEntitlement Approved · 1532 & 1556 Mt. Diablo Blvd. | 0 | 0 | 0 | 30 | 30 |
| The Residences at Abigail PlaceEntitlement Approved · 730 & 748 Minert Rd. | 1 | 0 | 0 | 16 | 17 |
| Waymark Phase 1Complete · 101 Pringle Ave. | 0 | 0 | 0 | 358 | 358 |
| Total, as reported by the City | 7 | 85 | 0 | 741 | 833 |
The City describes the table this way: “This table shows housing projects with permit or construction activity during 2023-2031. For brevity, *this table does not include single-unit projects (such as homes and ADUs); please see the annual progress reports above for this information. Please see our Development Projects page for more information on all developments within Walnut Creek.”
Source: City of Walnut Creek Housing Project Tracker · Checked Oct. 2, 2026

City Community Development Department opens application window for deed-restricted downtown condominium residences
2 min read

Zumper index highlights competitive median rents alongside growing transit-oriented residential development near BART
2 min read