Skip to content

Real Estate

Development

Walnut Creek housing, development and commercial property

Development tracker: City of Walnut Creek

Projects in the City of Walnut Creek’s planning records, by the status each project’s record states.

Under review
11
Approved
10
Under construction
9

9 of 30 projects

  • Under construction · Residential

    2670-2680 Walnut Blvd. Subdivision

    2670-2680 Walnut Blvd.

    A project to subdivide two existing lots into a 13-lot subdivision with 13 single-family small-lot homes. The applicant is seeking streamlined ministerial review under SB 330 and a Density Bonus.

    • Approvals requested: Design Review (Approved); Major Subdivision (Approved)
    • Application Y21-024 · Applicant: Prem Dhoot, Haven Development
  • Under construction · Residential

    Civic Crossing

    699 Ygnacio Valley Rd.

    The applicant, RCD, is proposing to demolish all structures associated with the former gas station and construct a new 5-story, mixed-use residential building containing 93, 100% affordable residential units and approximately 2,622 square feet of ground floor commercial area. 41 onsite parking spaces are provided in an enclosed garage located behind the commercial space with access off Civic Drive. The residential units are organized around a shared, 8,500 square foot courtyard space above the garage level. The applicant also requests State Density Bonus concessions and waivers of development standards for…

    • Application Y20-095 · Applicant: Norma Guzman, Resources for Community Development (RCD)
  • Under construction · Commercial

    F&M Bank

    1823 & 1871 N. Main St.

    Demolition of the vacant Target Garden Center and construction of a new 5,700 square foot freestanding bank with drive up ATM and customer parking lot.

    • Approvals requested: Design Review (Approved); Conditional Use Permit (Approved); Minor Subdivision (Approved); Tree Removal Permit (Approved)
    • Application Y15-085 · Applicant: Christy Newport, F&M Bank
  • Under construction · Residential

    Habitat for Humanity - Las Juntas

    1250 Las Juntas Wy.

    Development of a 42-unit multi-family residential project on a vacant site, formerly the Las Juntas Swim Club site. 67 total parking spaces on a surface lot. Site size: 2.05 acres.

    • Approvals requested: Design Review (Approved); Conditional Use Permit; Tentative Map; Tree Removal Permit; Dripline Encroachment Permit
    • Application Y17-079 · Applicant: Hamid Taeb, Habitat for Humanity EBSV
  • Under construction · Commercial

    Porsche

    2717 N. Main St., 1530 2nd Ave., & 1510 2nd Ave.

    The proposed project is a PD Rezone, Design Review and Lot Merger. The proejct will demolish all existing structures (former Masses building) and merge three parcels (2717 N. Main Street, 1530 2nd Avenue, and 1510 2nd Avenue) into a single 2.38-acre site to construct a new Porsche dealership. The three-level building includes a Basement level with vehicle inventory and wash bays, Ground floor with the auto service area, sales showroom, and offices, and Second floor with additional office space and inventory parking. The showroom will front both N. Main Street and 2nd Avenue, while the service/repair operations…

    • The City’s list of projects groups this as approved. Its project page says under construction.
    • Approvals requested: Design Review; Rezone; Lot Merger
    • Application Y25-058 · Applicant: Stephen Scanlon
  • Under construction · Commercial

    Rossmoor Pickleball Courts

    1021 Stanley Dollar Drive

    The project is proposing to build a new 12,309 sq. ft. Pickleball Court Facility. The project includes new landscaping, site design, lighting, and Tree removals. On December 4, 2024, the Design Review Commission held a Study Session to provide feedback on the proposed development. On March 27, 2025, the Planning Commission approved the project.

    • Approvals requested: Design Review; Minor Use Permit; Tree Removals
    • Application Y23-053 · Applicant: Ann Mottola, Golden Rain Foundation
  • Under construction · Commercial

    Shadelands SecureSpace/Calicraft Brewery

    2700 Mitchell Dr.

    The proposed project is a multi-use development which would include a 155,628-square-foot, three-story self-storage facility; a 1,040-square-foot, single-story leasing office building with public restroom facilities; and an 8,975-square-foot, two-story redeveloped Calicraft building. The self-storage facility would have three stories, each approximately 51,876 square feet for a total area of 155,628 square feet. The Calicraft building would be two-story and would have indoor, patio, and bar seating, as well as associated 50-seat outdoor gathering area and a 320-square-foot shipping container to be used as a bar…

    • Approvals requested: Conditional Use Permit; Design Review; Tree Removal Permit; Administrative Use Permit; Minor Use Permit
    • Application Y22-018 · Applicant: Brian Sorensen, InSite Property Group
  • Under construction · Residential

    The Residences at Abigail Place

    730 & 748 Minert Rd.

    Demo two existing homes to subdivide 2.03 acres into 17 single family lots (SB330, density bonus project).

    • City housing table: Entitlement Approved, 17 units: 1 very low, 0 low, 0 moderate, 16 above moderate income
    • Approvals requested: Design Review; Major Subdivision
    • Application Y22-019 · Applicant: Andy Byde, Caliber Ventures
  • Under construction · Mixed Use

    Walnut Creek Transit Village (WCTV)

    200 Ygnacio Valley Rd.

    596 residential apt units, 30,000 sq. ft. commercial space and a 5 level parking garage for 1,500 vehicles. Phases 1 and 2 are complete. The Waymark (Phase 3) is pending.

    • Approvals requested: Design Review (Approved)
    • Application Y05-027

Source: City of Walnut Creek Development Projects · Checked Oct. 2, 2026 · The City says its Project Pipeline list was last updated May 8, 2026

About these records
  • Every project, status, address and description here comes from the City of Walnut Creek’s own published pages. We do not add projects or change what a record says.
  • A status is shown in the City’s words, as its record for the project states it. Where it states none, none is shown, and where two of its pages differ, both are shown.
  • A status is an administrative record. An approval means planning approvals were granted, not that building has begun.
  • Unit counts and floor areas appear as written in each description; they are not totalled here.
  • The list covers the projects the City presents on these pages. Smaller projects, and records published only as documents or maps, are not included.

Housing pipeline

Homes in the housing projects the City of Walnut Creek tracks, by income level.

Total units
833
Very low income
7
Low income
85
Moderate income
0
Above moderate
741
Units by income level in each project
ProjectVery lowLowModerateAbove moderateTotal
Hope VillageEntitlement Approved · 2102 Tice Valley Blvd.60006
Mitchell TownhomesPlanning Application Submitted · 2775 Mitchell Drive0850337422
Mt. Diablo Mixed UseEntitlement Approved · 1532 & 1556 Mt. Diablo Blvd.0003030
The Residences at Abigail PlaceEntitlement Approved · 730 & 748 Minert Rd.1001617
Waymark Phase 1Complete · 101 Pringle Ave.000358358
Total, as reported by the City7850741833

The City describes the table this way: “This table shows housing projects with permit or construction activity during 2023-2031. For brevity, *this table does not include single-unit projects (such as homes and ADUs); please see the annual progress reports above for this information. Please see our Development Projects page for more information on all developments within Walnut Creek.”

Source: City of Walnut Creek Housing Project Tracker · Checked Oct. 2, 2026

About these numbers
  • The statuses and unit counts are the City of Walnut Creek’s, copied from its housing project table. The total row is its own.
  • The housing table and the development project pages are kept separately by the City and can show different statuses for the same project. Both are shown as published.
  • The income levels are the categories the City uses in its table.

All real estate stories and data