Skip to content

Community

Robert I. Schroder Pedestrian Bridge rehabilitation starts Oct. 5

By Walnut Creek Times
Network reporting
Published · 1 min read

Geometric dark blue bridge silhouette on left with bold orange arrow curving down-right to dark blue crossing shape with white stripes, on plain white backgroundOpen full-size image
Your listening Queue & catch up
Unheard stories first, timed at 1×. Your selections stay first.

Add a story or build a catch-up queue to start listening.

Work on the Robert I. Schroder Pedestrian Bridge will begin on Monday, October 5, 2026, and continue through Thursday, December 31, 2026, barring unforeseen circumstances. According to Contra Costa County, the work will occur between 9:00 p.m. and 5:00 a.m., Sunday through Thursday, excluding holidays, weather permitting.

According to According to Contra Costa County: The project includes replacing bearing pads, performing paint repairs, treating the bridge deck, and replacing sidewalks and curbs.

According to According to Contra Costa County: The bridge will be closed for the duration of the project, and pedestrian and bicycle users on the Iron Horse Trail will be redirected to the existing street crossing on Treat Boulevard for approximately 3-4 months.

According to According to Contra Costa County: Drivers can expect 10-minute delays on Treat Boulevard during construction, with occasional lane closures.

According to According to Contra Costa County: Approximately four night-time road closures on Treat Boulevard will be required for bearing pad replacement work, with an approximate 5-mile traffic detour.

According to According to Contra Costa County: Funding for the project is provided by Measure X Funds and Park Dedication Funds.

Sources

Comments (0)

No comments yet. Be the first to share a thought on this story.

More local stories