Skip to content
Christmas & Holiday Lights 2026Explore the community map

Contra Costa Street Safety

Martinez council rejects intersection plan for Alhambra road safety

Councilmembers critique $300,000 Advanced Mobility Group study after summer repaving removed six blocks of Alhambra Avenue bike lanes.

By Walnut Creek Times
Published · 4 min read

Martinez suburban arterial roadway with painted green bike lane markings, yellow pedestrian crosswalks, and landscaped center medians against Contra Costa hills
The Martinez City Council directed transportation consultant Advanced Mobility Group and city staff to return with a corridor-wide road safety plan for Alhambra Avenue rather than an intersection-by-intersection approach. · Walnut Creek Times Visuals
Your listening Queue & catch up
Unheard stories first, timed at 1×. Your selections stay first.

Add a story or build a catch-up queue to start listening.

The Martinez City Council directed outside traffic consultant Advanced Mobility Group (AMG) and city engineering staff to return with a comprehensive, corridor-wide road safety redesign after rejecting an intersection-by-intersection proposal during its Nov. 18 meeting, according to Martinez News and Views.

For the 2nd consecutive council meeting—following a Nov. 4 session where bicyclists protested the unannounced removal of 6 blocks of Alhambra Avenue bike lanes between F and Bertola streets—councilmembers debated how to protect cyclists and pedestrians along the city's busiest thoroughfare without compromising emergency response or neighborhood access.

$300,000 Traffic Study Ranks 25 Priority Intersections Across Martinez

During the Nov. 18 update, AMG Vice President of Transportation Planning Christoper Thnay presented conceptual remedies from a $300,000 council-commissioned traffic study evaluating collision data across the city's top 25 priority intersections:

  • Alhambra Avenue Hotspots: Alhambra Avenue appeared 9 times among the top 25 priority intersections, including 5 entries in the top 10—No. 4 at Phylis Place/Phylis Terrace, No. 5 at F Street, No. 6 at H Street, No. 8 at Franklin Canyon Road, and No. 9 at Alhambra Way. Other top-10 intersections included No. 1 at Arnold Drive and Morello Avenue, No. 2 at Howe Road and Old Orchard Road, No. 3 at Berrellesa and Green streets, No. 7 at Blue Ridge Drive and Reliez Valley Road, and No. 10 at Muir Road and Roman Way.
  • Glacier Drive & Center Avenue Concept: For Glacier Drive and Center Avenue in District 3 (initially ranked No. 18 before moving up to No. 9), Thnay proposed raising the entire intersection into a square speedhump, repainting crosswalks bright yellow with advance yellow arrows, extending 3 corner curbs, narrowing vehicle lanes, and adding 2 feet of bicycle lane buffer.
  • Arnold Drive & Morello Avenue Concept: At the city's No. 1 ranked intersection, AMG recommended corner curb extensions, high-visibility crosswalks, repainted bike lanes, and green bike boxes ahead of vehicle lanes.

Council Demands Holistic Alhambra Corridor Plan Over Piecemeal Sharrows

The Alhambra Avenue controversy began after a summer repaving project revealed that existing bicycle lanes between F and Bertola streets did not meet standard width thresholds. After consulting the city's insurance provider, City Engineer Joe Enke replaced 6 blocks of dedicated bike lanes with painted green "sharrows" (shared motor-vehicle and bicycle lanes) without prior council or public notice.

Mayor Brianne Zorn and Vice Mayor Satinder S. Malhi argued that addressing Alhambra Avenue one intersection at a time failed to fix the corridor. "We paid you 300 grand, and this is what we got?" Malhi said, calling a purely crash-data approach "myopic" after dozens of Center Avenue residents submitted a petition citing frequent near misses. More than 25 residents spoke during public comment, debating a potential "road diet" lane reduction or losing roughly 40 on-street parking spaces. Councilmembers Greg Young, Jay Howard, and Debbie McKillop also weighed in, with Howard urging protection for ambulance and fire truck response times and McKillop suggesting narrowing or removing disconnected center medians to gain the few feet needed for safer bike lanes.

The extended traffic debate postponed discussion of repairing the Marina Vista Avenue archway sign. Elsewhere in Martinez, the Martinez Unified School District (MUSD) Board of Education scheduled a special workshop for Monday at 3:00 p.m. at 921 Susana St. to evaluate relocating the adult school campus from F Street to build education workforce housing; the city released its draft 15-year Park System Master Plan ahead of a Dec. 7 joint meeting at 6:00 p.m. at 525 Henrietta St. (with written comments due Dec. 3) and scheduled accessory dwelling unit (ADU) webinars for Dec. 2 (12:00 p.m.–1:00 p.m.) and Dec. 3 (5:00 p.m.–6:00 p.m.); and PBF Energy reported receiving $1.25 billion in insurance proceeds to date following the February 2025 Martinez refinery fire, after returning the facility to full operation in May.

Sources

Comments (0)

No comments yet. Be the first to share a thought on this story.